View the complete Policies and Procedures for Processing Water and Wastewater Projects for Design and Construction Manual. (pdf, 2.03mb, 85pp, timely download).
For shorter download time you may view the manual by individual sections below.
Design Criteria for Wastewater Projects General Preliminary Design Procedure Wastewater Mains and Laterals Wastewater Lift Stations and Force Mains
Section IV: 1 Introduction
Section IV: 2 Civil Design Criteria
Section IV: 3 Structural Design Criteria
Section IV: 4 Mechanical Design Criteria
Section IV: 5 Electrical and Instrumentation Design Criteria
Section IV: 6 Project Closeout
Subsection IV:7 Design Criteria for Wastewater Mains
Formal Community Facilities Agreement
*This is for information only. The formal CFA will be prepared by Water staff.