Cantrell Sansom Road Widen Cantrell Sansom Road between Mark IV Parkway and the future IH 35W southbound frontage road. The widening will consist of adding two westbound and two eastbound lanes.
Cromwell Marine Creek Road Widening A four-lane divided road from Bowman Roberts Rd. to S. Chesterfield Dr. with two-lane roundabouts at Bowman Roberts and Huffines Blvd. will be constructed.
Haltom Rd Railroad Crossing Improvements Safety improvements at the intersection of the Trinity Railway Express (TRE) railroad and Haltom Road.
Long Avenue Bridge Rehabilitation This project will replace the E. Long Avenue bridge deck over the railroad and rehabilitate the roadway approach.
Walnut Creek Sewer Extension The Walnut Creek sewer extension will provide sanitary sewer service for future development.
Alemeda Street Stormwater Improvements Culvert improvements are proposed for AlemedaStreet south of Camp Bowie West Boulevard to addressexisting hazards from flood waters overtoppingthis location. In conjunction with the culvertimprovements, the road will be widened and realignedso that it lines up with Alemeda Street north of CampBowie West.
Park Hill Drive & 8th Avenue Infrastructure Improvements Water and/or sewer mains will be replaced in the Park Hill Drive and 8th Avenue area. This area is bound by West Jessamine Street to the north, West Cantey Street to the south, Shirley Avenue to the west, and 8th Avenue to the east.
Downtown Street Resurfacing Program 2023 This project is the last phase of a four-year program started in 2020 for improvements to the downtown Fort Worth streets.
Safe Routes to School - C.C. Moss & M.L. Phillips This Safe Routes to School project completed new sidewalks, curb ramps, driveways, and signs for both Christene C. Moss and Mary Louise Phillips Elementary School campuses.
Golden Triangle Boulevard An arterial, a four-lane high-capacity road, will be constructed from I-35 to Misty Redwood Trail.
Harmon Road Widening Harmon Road has been rebuilt as a four-lane road from Golden Triangle Boulevard to US287.
Basswood Boulevard and Kroger Drive at US377 Design and construction of safety and capacity improvements at the Basswood Boulevard crossing of the UPRR at the intersection of US 377 and at the Kroger Drive Crossing of the UPRR at the intersection of US 377.
Upper Big Fossil Creek Wastewater Improvements A sewer main that runs through The Golf Club Fossil Creek will be rehabilitated and a new sewer main will be constructed to run parallel to the existing main.
Westcliff, Foster Park, Overton & Summerfields Area Improvements Existing water and sewer mains will be replaced in an area bound by Sunnybank Drive at Western Center Boulevard to the north, Overton Ridge Boulevard to the west, South Drive to the south and Trail Lake Drive to the east.
Benton Avenue, Near Southside Infrastructure Improvements Improvements include rehabilitation of existing asphalt pavement, new curb and gutter, driveways and replacement of water/sewer mains and services on the following streets: Benton Avenue - Hampshire to Old Handley House Street - Panola to Cul-de-sac Windowmere Street - Benton to Springfield
Lake Arlington Force Main Part 1 Improvements The Lake Arlington force main is part of a project that will increase the sanitary sewer capacity to handle projected growth. That growth includes the new Tarleton campus as well as the wholesale cities of Burleson and Crowle
Safe Routes to School - South Completed in 2023. New sidewalks, curb ramps, driveways, signs and more at both Daggett and D. McRae Elementary School campuses.
Avenue J & Avenue K Infrastructure Improvements Fort Worth Water is replacing water mains in an area east of Collard Street, between Avenue J and Avenue K.
Trinity Boulevard Improvements The project is being conducted in two phases in order to keep one lane of traffic open in each direction.
McCart Ave. and McPherson Blvd. Project McCart Avenue, from Risinger Road to McPherson Boulevard, will be constructed as a four-lane, divided arterial. McCart Ave., from McPherson Boulevard to Twin Leaf Dr., will be constructed as a two-lane, undivided roadway.
North Crowley Rd & N Crowley Cleburne Rd Intersection Intersection improvements will be made to the existing intersection at North Crowley Road and North Crowley Cleburne Road.
Westcliff, Como, Bluebonnet and Stop 6 Infrastructure Improvements The Westcliff, Como, Bluebonnet and Stop 6 Infrastructure Improvement project includes three areas in three council districts. The project sites are south of I-30/West Freeway, east of Camp Bowie Boulevard, northwest of Granbury Road and west of East Loop 820 South.
Tavolo Park Sewer Main Improvements A 30-inch in diameter sanitary sewer main will be rehabilitated - or replaced - in an area that is bound by Altamesa Boulevard to the north, Harris Parkway to the east, Columbus Trail at Old Granbury Road to the south and Quail Ridge Road to the west. This is in the Tavolo Park and The Chisholm at Tavolo Park area.
South Hills South Water and Sewer Improvements Existing water and sewer mains will be replaced in an area bound by Interstate 20 to the north, McCart Avenue to the east, South Hills High School to the south and Westcreek Drive to the west.
Animal Care & Control Facility A second animal care and control facility that will be located in north Fort Worth will be designed. This facility is expected to house approximately 100 animals.
Bonds Ranch Road Improvements Phase 2 Road work on Bonds Ranch Road from US 287 to Shire Meadow Drive has been completed. Work continues on miscellaneous drainage improvements.
Cromwell Marine Creek Road Widening A four-lane divided road from Bowman Roberts Rd. to S. Chesterfield Dr. with two-lane roundabouts at Bowman Roberts and Huffines Blvd. will be constructed.
Downtown Street Resurfacing Program 2023 This project is the last phase of a four-year program started in 2020 for improvements to the downtown Fort Worth streets.
Harmon Road Widening Harmon Road has been rebuilt as a four-lane road from Golden Triangle Boulevard to US287.
Altamesa Boulevard & Crowley Road Intersection Improvements Enhancements to the existing intersection at Altamesa Boulevard and Crowley Road (FM731)will be implemented. These enhancements include adding additional left-turn lanes and other recommended improvements.
Crowley Road & Altamesa Boulevard Intersection Improvements Intersection improvements including new left turn lanes, accessible ramps and crosswalks, and new traffic signals.
Crowley Road & Sycamore School Road Intersection Improvements Reconstruction of portions of the Crowley Road and Sycamore School Road intersection including additional left turn lanes and new signalization.
Near Southside Improvements This four year program addresses needed street improvements by facilitating redevelopment and revitalization in identified areas of the Near Southside District.
North Crowley Rd & N Crowley Cleburne Rd Intersection Intersection improvements will be made to the existing intersection at North Crowley Road and North Crowley Cleburne Road.
Park Hill Drive & 8th Avenue Infrastructure Improvements Water and/or sewer mains will be replaced in the Park Hill Drive and 8th Avenue area. This area is bound by West Jessamine Street to the north, West Cantey Street to the south, Shirley Avenue to the west, and 8th Avenue to the east.
Downtown Street Resurfacing Program 2023 This project is the last phase of a four-year program started in 2020 for improvements to the downtown Fort Worth streets.
Near Southside Improvements This four year program addresses needed street improvements by facilitating redevelopment and revitalization in identified areas of the Near Southside District.
Union Pacific RR Kellis Quiet Zone This project will design and construct paving improvements to support quiet zone implementations at five crossings of the Union Pacific Railroad including Bewick Street, Dickson Street, Bolt Street and Kellis Street.
Safe Routes to School - South Completed in 2023. New sidewalks, curb ramps, driveways, signs and more at both Daggett and D. McRae Elementary School campuses.
Animal Care & Control Facility A second animal care and control facility that will be located in north Fort Worth will be designed. This facility is expected to house approximately 100 animals.
Alemeda Street Stormwater Improvements Culvert improvements are proposed for AlemedaStreet south of Camp Bowie West Boulevard to addressexisting hazards from flood waters overtoppingthis location. In conjunction with the culvertimprovements, the road will be widened and realignedso that it lines up with Alemeda Street north of CampBowie West.
Lebow Channel Improvements at 28th Street The Lebow Channel improvements project is located near 28th and Decatur Avenue on Lebow Channel and is currently being evaluated for feasibility via the project development program.
Westcliff Drainage Improvements This project is a multi-phase project to reduce flooding in the Westcliff South drainage basin.
Central Arlington Heights Property Acquisition & Drainage Improvements Voluntary property acquisition project to acquire flood-prone properties on Western and Carleton between Bryce and El Campo.
Greenfield Acres Drainage Improvements An underground storm drain system will be constructed on Cindy Lane, from Ten Mile Bridge to North Ridge Road, and on East North Hill Lane.
Far Northwest Library The City of Fort Worth is building a new library serving residents in District 10 in the far northwest portion of the City.
Meadowbrook Golf Course Renovations The City of Fort Worth is renovating Meadowbrook Golf Course with construction set to start in March of 2024.
Fort Worth Nature Center & Refuge Boardwalk Expansion The City of Fort Worth is expanding the boardwalk at Nature Center & Refuge as well as adding a pavilion and trails.
Altamesa Boulevard & Crowley Road Intersection Improvements Enhancements to the existing intersection at Altamesa Boulevard and Crowley Road (FM731)will be implemented. These enhancements include adding additional left-turn lanes and other recommended improvements.
Avondale Haslet Road Improvements A portion of Avondale Haslet Road will be reconstructed from two lanes to four lanes. This improvement will reduce congestion and improve mobility.
Benton Avenue, Near Southside Infrastructure Improvements Improvements include rehabilitation of existing asphalt pavement, new curb and gutter, driveways and replacement of water/sewer mains and services on the following streets: Benton Avenue - Hampshire to Old Handley House Street - Panola to Cul-de-sac Windowmere Street - Benton to Springfield
Bonds Ranch Road Improvements Phase 2 Road work on Bonds Ranch Road from US 287 to Shire Meadow Drive has been completed. Work continues on miscellaneous drainage improvements.
Cantrell Sansom Road Widen Cantrell Sansom Road between Mark IV Parkway and the future IH 35W southbound frontage road. The widening will consist of adding two westbound and two eastbound lanes.
Walnut Creek Sewer Extension The Walnut Creek sewer extension will provide sanitary sewer service for future development.
Park Hill Drive & 8th Avenue Infrastructure Improvements Water and/or sewer mains will be replaced in the Park Hill Drive and 8th Avenue area. This area is bound by West Jessamine Street to the north, West Cantey Street to the south, Shirley Avenue to the west, and 8th Avenue to the east.
Lake Arlington Lift Station A lift station is used to pump wastewater or sewage from a lower level or elevation to a higher level.
Lake Arlington Force Main Part 1 Improvements The Lake Arlington force main is part of a project that will increase the sanitary sewer capacity to handle projected growth. That growth includes the new Tarleton campus as well as the wholesale cities of Burleson and Crowle
Avenue J & Avenue K Infrastructure Improvements Fort Worth Water is replacing water mains in an area east of Collard Street, between Avenue J and Avenue K.