North Beach Street and Basswood Boulevard Intersection Improvements

Closed January 07, 2021, 01:30 PM

  • Reference number101582
  • StatusOpen

GENERAL DESCRIPTION OF WORK

The major work will consist of the (approximate) following: Removal of 1,804 SF of sidewalk, 7 ADA Ramps, 1,350 SY of concrete pavement; removal of 702 SY of asphalt pavement;  removal of 16 trees from the existing medians in Basswood Boulevard; installation of 2,140 feet of electrical conduit for traffic signals, street lights, and ADA crossings; full intersection signal modifications with all related appurtenances; installing 4,260 SY of 11” concrete pavement, 7 ADA Ramps, 1,440 SF of 5’ sidewalk, installing 16 trees; removal and replacement of air relief valve and vault; and reconstruction of water valve vault lid.