CANCELLED: Trinity Boulevard Phase 1

Closed September 16, 2021, 01:30 PM

  • Reference number102101
  • StatusCanceled
  • SummaryThe major work will consist of the (approximate) following: 40,000 SY of 10” Concrete Paving, 112,600 SF Concrete Sidewalk, and Storm Drain for the roadway corridor including a multi-lane roundabout and two traffic signal installations. Additionally, there will be 4,300 LF 36” Water line relocation, Utility Adjustments, Street Lighting, Pavement Marking and Signage, Landscaping in roundabout, etc.