2021 Bridge Rehabilitation Contract 2

Closed April 01, 2021, 01:30 PM

  • Reference number103097
  • StatusOpen
  • SummaryGeneral Description of Work
    The major work will consist of the (approximate) following:

    725 LF Header Type Expansion Joint
    334 LF Handrail
    75 LF Replace Steel Rail
    1 EA Crash Cushion Attenuator
    147 SF Concrete Structural Repair