2021 Como Area Resurfacing Project

Closed September 02, 2021, 01:30 PM

  • Reference number103348
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    33,630 SY 2” Asphalt Pavement Surface Course, Type D
    33,630 SY 2” Surface Milling
    6,100 SY 3” Asphalt Pavement Surface Course, Type D
    6,100 SY 11” Pavement Pulverization
    2,070 SF Barrier Free Ramp