2022 Concrete Restoration Contract 3

Closed December 02, 2021, 01:30 PM

  • Reference number103444
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    8,451 SY Remove Concrete and Replace with 7” Concrete
    Pavement HES
    900 CY Flex Base
    4,000 SY Geogrid