2018 CIP Intersection Improvements, Altamesa Boulevard and Crowley Rd

Closed March 24, 2022, 01:30 PM

  • Reference number101579
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    UNIT 1: Paving Improvements:

    474 SY of 2" Asphalt Pvmt, Type C (Base)
    743 SY of 4" Asphalt Pvmt, Type B (Base)
    415 SY of 7" Conc Pvmt
    663 SY of 9” Conc Pvmt
    1,054 LF of 6" Conc Curb and Gutter
    Traffic Signal, Striping and Illumination Improvements