2021 North Riverside Resurfacing Project

Closed April 14, 2022, 01:30 PM

  • Reference number102877
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    44,000 SY 2” Asphalt Pavement Surface Course, Type D
    44,000 SY 2” Surface Milling
    200 CY Asphalt Base Repair
    3,520 SF Barrier Free Ramp
    5,800 SF 4” Sidewalk
    5,500 LF 7” Concrete Curb & Gutter
    34,060 LF HAS Pavement Marking
    4 EA RRFB Assembly Double Sided, Solar