GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following:
Water:
859 LF 16” PVC Water Pipe by Open-Cut
160 LF 16” DIP Water Pipe by Open-Cut
5,937 LF 8” PVC Water Pipe by Open-Cut
120 LF 8” DIP Water Pipe by Open-Cut
Sanitary Sewer:
2040 LF 8” PVC Sewer Pipe, SDR-26 by Open Cut
11 EA 4’ Manhole
Storm Drain:
50 LF 21” RCP Class III Pipe, by Open Cut
411 LF 24” RCP Class III Pipe, by Open Cut
280 LF 36” RCP Class III Pipe, by Open Cut
87 LF 42” RCP Class III Pipe, by Open Cut
2 EA 4’ Storm Junction Box
1 EA 6’ Storm Junction Box
5 EA Curb Inlet
Paving:
Base Bid, Concrete Paving Improvements
19,000 SY Concrete Pavement
28,500 SF Concrete Driveway
42,100 SF Concrete Sidewalk
28,500 SF 6” Conc Driveway
Alternative Bid, POL Paving Improvements
16,500 SY Pavement Pulverization
16,500 SY 3” Asphalt Pvmt Type D