2022 Bond Year 1 - Contract 4

Closed November 17, 2022, 01:30 PM

  • Reference number102930
  • StatusOpen

The major work will consist of the (approximate) following:

Unit 1:  Water Improvements:

60        LF - 6” Water Line by Open Cut

3,610    LF - 8” Water Line by Open Cut

760       LF - 16” Water Line by Open Cut

4          EA - 8” Gate Valve

11        EA - 16” Gate Valve with Vault

5          EA - Fire Hydrant

84        EA - 1” Water Service

 

Unit 2:  Sanitary Sewer Improvements:

3,330    LF - 8” Sewer Pipe by Open Cut

510       LF - 10” Sewer Pipe by Open Cut

21        EA - 4’ Manhole

10        EA - 4’ Drop Manhole

120       EA - 4” Sewer Service

 

Unit 3:  Paving Improvements:

9,920    LF - 6” Concrete Curb (Base Bid)

9,090    LF - 6” Concrete Curb and Gutter (Alternate)

15,760  SF - 6” Concrete Driveway

1,520    SF - 8” Concrete Driveway

16,300  SY - 11” Pavement Pulverization (Alternate)

16,300  SY - 3” Asphalt Pavement (Alternate)

30,240  SF - 4” Concrete Sidewalk

3,220    SF - 4” Concrete Sidewalk, Adjacent to Curb