Closed August 18, 2022, 01:30 PM
The major work will consist of the (approximate) following: The scope of work includes Storm Water pipe rehabilitation at the following locations; • Carroll Street and Merrimac Street Storm Drain Rehabilitation - CPN 103055: Includes 620 LF of 30-inch Storm Water Pipe Rehabilitation by Cured-in-place pipe (CIPP) • 5 th Street at Carroll Street to Railroad Storm Drain Rehabilitation – CPN 103059: Includes 900 LF of 96-inch by 68-inch Arch Storm Water Pipe Rehabilitation by Spray Applied Pipe Lining (SAPL) with Cementitious Material.