2022 Bridge Rehabilitation Contract 1

Closed October 06, 2022, 01:30 PM

  • Reference number103454
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    204 CY Approach Slab
    415 SY Concrete Pavement
    4,692 SY Penetrating Concrete Surface Treatment
    490 SF Concrete Structural Repair Standard
    464 CY Cement Stabilize Backfill
    624 EA Repair Streel Bridge Member
    189 LF Replace Steel Rail