2023 Asphalt Resurfacing Contract 2

Closed August 25, 2022, 01:30 PM

  • Reference number104178
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    21,825 SY 3” Asphalt Pavement Surface Course, Type D
    21,825 SY 11” Pavement Pulverization
    12,126 LF 7” Curb and Gutter
    3,925 SF 6” Concrete Driveway