The work includes a 120 MGD Lift Station, Influent Diversion Structure, 90-inch sewer pipeline, 66-inch force main, 72-inch emergency bypass, flow meter vault, modifications to Box F1, G and Bar Screen Building No3, odor control system, modifications to Headworks Facility with an addition of one fine screen and coarse screen, associated utilities, as well as necessary electrical and instrumentation.