Westside Water Treatment Plant Plate Settler Expansion Project

Closed April 01, 2021, 01:30 PM

  • Reference number102052
  • StatusOpen
  • SummaryThe scope of work for the Westside WTP Plate Settler Expansion Project consists of:
  • Replacement of raw water meter and flow control valve
  • Installation of additional Plate Settlers in the existing three sedimentation basins
  • Installation of Filter 5
  • Installation of new membrane feed pump (No. 5)
  • Modifications to the finished water sampling stations