Westside III 24-Inch Water Transmission Main

Closed May 19, 2022, 01:30 PM

  • Reference number102689
  • StatusOpen
  • SummaryThe Westside III 24-inch diameter water transmission main will be constructed along the south side of Interstate 20. It will extend from the Westside III 42-inch water transmission main eastward to the intersection of I-20 at Chapin School Road. The distance is about 1.8 miles.