Clear Fork Drainage Basin M-210 Sewer Improvements-Part 5

Closed May 05, 2022, 01:30 PM

  • Reference number103389
  • StatusOpen
  • SummaryThis project is replacing a cast iron water main and installing a larger sewer line in Mockingbird Lane. A new 12-inch water main will be installed from Simondale Drive westward to the end of Mockingbird Lane. A new 30-inch sewer main will be installed between Simondale Drive and Hartwood Drive to alleviate an overflow that occurs during storm events.