This capital improvement project includes constructing four water meter vaults – including modifications to the water piping – and replacing two meters and one valve at the Rolling Hills Water Treatment Plant.
Four pre-purchased flow meters will be installed within the meter vaults to enhance the metering accuracy of treated water pumped from the plant.
The plant is located south of I-20 and east of the Fort Worth and Western Railroad.
This project is in Fort Worth Council District 8.
2500 SE Loop 820, Fort Worth 76140 View Map
2500 SE Loop 820 , Fort Worth 76140
Construction
January 2025
102056