Sycamore Creek Sewer Rehabilitation

  • Project typeWater and Wastewater Improvements
  • Project value$15,658,139.00
Water & Sanitary Sewer Imrpovements

This Sycamore Creek Sewer Rehabilitation capital improvement project will rehabilitate the existing sanitary sewer lines – from I-30 South to the I-35/I-20 exchange. 

The current sewer main does not have the capacity to serve existing customers in the Sycamore Creek basin area and the proposed developments that would be located further south.

The existing lines parallel the new lines that are being constructed.

  • Phase 1 of the parallel lines started at I-30 (Trinity Trails System) and extended south to Union Pacific Railroad, along Windham Street. (complete)
  • Phase 2 picked up at Windham Street and proceeded south through the former 9-hole Sycamore Creek Golf Course to south of East Vickery Boulevard (complete)
  • Phase 3 - Sycamore Creek South Wastewater Improvements - extends from Vickery to Cobb Park Drive (construction; projected end date is September 2024)
  • Sycamore Creek Sewer Rehabilitation (complete)
  • Phase 4A and 4B - Sycamore Creek Phase 4A & 4B Wastewater Improvements - is the final phase that is responsible for constructing a sewer main - parallel to an existing sewer main (Phase 4A is in final design with a projected end date of  July 2027; Phase 4B design is on hold with a projected end date of February 2028)

 

The new 66-inch diameter sewer main in Phases 1-3 will run parallel to the existing sewer main which varies in diameter from 48 inches to 54 inches. Both lines will feed into the Village Creek Water Reclamation Facility.

 

This sewer rehabilitation project is in Fort Worth Council District 8.