- Project typeStreet & Transportation Improvements
- Project value$2.8 million
- Project scheduleJanuary 2025
This is a maintenance project invloving resurfacing the existing asphalt pavement with 2" asphalt overlay of new material.
Along with the pavement maintenance, there will be localized replacement of damaged concrete curb and gutter, sidewalk, and ramps.
August 15-30, 2024
• Bellaire Drive S: from S. Hulen Street to Overton Park Drive
• Overton Park Drive: from Bellaire Drive to Hartwood Drive
• Harlanwood Drive: from S Hulen Street to Overton Park Drive
• Glenwood Drive: from S Hulen Street to Overton Park Drive
September 2-November 1, 2024
• Colonial Parkway: from Rogers Road to University Dr
• Merida Avenue: from Benbrook Boulevard to W Berry Street
This project is in Council District 3.
July 2024 Project Update
Existing asphalt pavement will be replaced on the following streets:
July 29-August 2
• Bellaire Drive N: from Pond Drive to Stadium Drive
• Stadium Drive: from Bellaire Drive N to W Cantey Street
• Park Hill Drive: from Colonial Parkway to Shirley Avenue
Location
2433 S University Dr., Fort Worth 76109 View Map
32.7163169,-97.3601973
2433 S University Dr. ,
Fort Worth 76109
2433 S University Dr. ,
Fort Worth 76109
Pavement Project - TCU & Zoo