University Dr & BRIT Drainage project

  • Project typeDrainage Improvements
Drainage Improvements

This project involves the replacement of the entire drainage pipe to provide a better storm drain system.

The current pipe has several issues such as a hole on top and internal lining failures.

These will be addressed through full replacement of entire pipe and improved to current design standards.

 

This project is in Council District 7.

 

April 2025 Project Status 

  • Final design is complete consisting of roughly 300 linear feet of new reinforced concrete storm drain.
  • Construction to begin in Spring 2025.

 

Project meetings

Project news

  • There is no project news available at this time.

Location

1700 University Dr., Fort Worth 76107  View Map

Google Map