Removing sections of existing concrete waterline pipe in seven (7) different locations, in six (6) locations, replacing each section with a flow meter and associated piping to complete the pipeline, in one (1) location, replacing a section with an isolation valve and associated piping to complete the pipeline, construction of a concrete vault to house each meter and valve. Four (4) meters to be installed are already purchased and on-site. The valve and two (2) of the meters shall be supplied by the Contractor. Various additional work such as, but not limited to, line de-watering, shoring, disposal, shutdown coordination, pavement removal and replacement, electrical and instrumentation work as required for operation.