Trinity Boulevard Phase 2
Reference number: 103280
Closed
February 01, 2024, 01:30 PM
The major work will consist of the (approximate) following: 16,000 SY of 10” Concrete Paving, 46,000 SF Concrete Sidewalk, Storm Drain for the roadway corridor and a traffic signal installation. Additionally, there will be 2,200 LF 36” Water line, Utility Adjustments, Street Lighting, Pavement Marking and Signage, Landscaping along the street corridor, and Stamped & Colored Concrete.