Thanksgiving holiday schedules
Most City offices, including City Hall, will be closed Nov. 28-29 for the Thanksgiving holiday. Emergency services will be available as usual.See details
Citywide Master Transportation Plan CPN 104860
Citywide Master Transportation Plan Request for Proposals(PDF, 494KB)
Citywide Master Transportation Plan Pre-Proposal Presentation(PDF, 702KB)
Citywide Master Transportation Plan Preproposal QA(PDF, 98KB)
Citywide Master Transportation Plan Preproposal Sign-In Sheet(PDF, 82KB)
The 2020 Transportation and Public Works (TPW) Request For Qualifications (RFQ) for Professional Engineering Design and Consultant Services, for Delivery of Planning, Design, and Construction of Capital Projects is complete.
The objective of the RFQ was to identify the most competent and qualified firms from which the City may negotiate contracts for professional design services that will be necessary to complete various TPW Capital Delivery Division (CDD) projects. The pre-qualified professional services providers will be considered a pool of the most qualified design firms from which contracts may be negotiated relating to TPW CDD projects arising over the next four years.
Pre-qualified TPW CDD Professional Services Provider List
Consultant Selection Guide
Sign up to be notified of future Transportation Opportunities
The requirements outlined in this manual provide standards and criteria for design of city streets and is applicable to all types of street construction, including appurtenances to streets such as sidewalks, streetlights, street signs, and electronic signals. View the manual here(PDF, 18MB).
Learn more
Visit the Permits page to download application packets.
CFW STANDARDS
All standard specification, detail drawings and associated documents are available for download through Public folders on e-Builder “Project Resources”
Specifications
Below are links to “Specifications”
Division 00 – General Conditions
Division 01 – General Requirements
Division 02 – Existing Conditions
Division 03 – Concrete
Division 26 – Electrical
Division 31 – Earthwork
Division 32 – Exterior Improvements
Division 33 – Utilities
Division 34 - Transportation
Below are links to “Construction Details”:
Misc – Backfill, Embedment and Surface Repair Assembly and Standard Abbreviation List
000 – GENERAL
100 – WATER
200 – SANITARY SEWER
300 – RECLAIMED WATER
400 – STORM DRAIN
500 – PAVING
600 – TRAFFIC
Project Signs
Work Zone
General Construction Notes
Most permits require traffic control plans. View specifications and sample plans. For information on Street Classifications, view the Master Thoroughfare Plan.
View TPW Current Bids & Requests
Request Repairs or Report Problems Online
Director: Lauren Prieur