Contractors

The 2020 Transportation and Public Works (TPW) Request For Qualifications (RFQ) for Professional Engineering Design and Consultant Services, for Delivery of Planning, Design, and Construction of Capital Projects is complete.

The objective of the RFQ was to identify the most competent and qualified firms from which the City may negotiate contracts for professional design services that will be necessary to complete various TPW Capital Delivery Division (CDD) projects. The pre-qualified professional services providers will be considered a pool of the most qualified design firms from which contracts may be negotiated relating to TPW CDD projects arising over the next four years.

Pre-qualified TPW CDD Professional Services Provider List

Consultant Selection Guide

Sign up to be notified of future Transportation Opportunities

 

Transportation Engineering Manual

The requirements outlined in this manual provide standards and criteria for design of city streets and is applicable to all types of street construction, including appurtenances to streets such as sidewalks, streetlights, street signs, and electronic signals. View the manual here(PDF, 18MB).

Learn more

Forms & Permits

Visit the Permits page to download application packets.

CFW Construction Standards

CFW STANDARDS

All standard specification, detail drawings and associated documents are available for download through Public folders on e-Builder “Project Resources”

Specifications

Below are links to “Specifications”

 

For Capital Delivery Projects

Division 00 – General Conditions

Division 01 – General Requirements

 

Standard Specifications for all Construction Projects

Division 02 – Existing Conditions

Division 03 – Concrete

Division 26 – Electrical

Division 31 – Earthwork

Division 32 – Exterior Improvements

Division 33 – Utilities

Division 34 - Transportation

 

Construction Details

Below are links to “Construction Details”:

Misc – Backfill, Embedment and Surface Repair Assembly and Standard Abbreviation List

000 – GENERAL

100 – WATER

200 – SANITARY SEWER

300 – RECLAIMED WATER

400 – STORM DRAIN

500 – PAVING

600 – TRAFFIC

Project Signs

Work Zone

General Construction Notes

Traffic Control Plans

Most permits require traffic control plans. View specifications and sample plans. For information on Street Classifications, view the Master Thoroughfare Plan.

Construction Bids